Add to Favorites
Share

Marine Polyurethane Paint

  • Description
Product Detail

    725-S52-60 Aliphatic polyurethane finish-Multicolor

     

    Product Description

    -A two pack acrylic polyurethane finish giving excellent durability and long term recoatability.

    -High Volume Solids

    -Pass the test of NORSOK M501

    -VOC less than 250g/L

     

    Intended Uses

    -A tough cosmetic finish

    -For use in offshore structureenvironment,such as petrochemical plants, chemical plants, power stations, bridges and industrial buildings

    -For marine engineering.

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Product Information

     

    Volume Solids

    72%±2%

     

    Finish/Sheen

    ??

    Gloss

     

    Typical Film Thickness

     

    80 microns dry (111microns wet)

     

    Theoretical Coverage

     

    9m2/L at typical film thickness

     

    Mix Ratio

     

    7:1(volume)10:1(mass)

     

    Method of Application

     

     

    Airless Spray

    Recommended

     

    Tip size range

    0.38-0.53mm

     

     

    Output pressure

    =17MPa

    Air Spray

    Tip size range

    2.0-3.0mm

     

    Output pressure

    =0.4MPa

    Brush/Roller

    For small area only

     

    Thinner

    Not recommended. Use only in exceptional circumstances (volume 5%)

    Cleaner

    BX-28

    Induction Period

    Not required

    Drying Information

     

    -5?

    5?

    25?

    35?

    Touch Dry

    4h

    2h

    40min

    30min

    Hard Dry

    48h

    24h

    8h

    6h

    Pot Life

    8h

    6h

    4h

    4h

    Overcoating Data          Substrate Temperature

    Overcoated by

    725-S52-60

    -5?

    5?

    25?

    35?

    Min Max

    Min Max

    Min Max

    Min Max

    48h

    24h

    8h

    6h

    Storage

    Store in cool and dry conditions. Well ventilate. Keep away from hot and fire. Shelf Life: 12 months minimum at 25?. Subject to re-inspection thereafter

    Pack Size

    Part A

    23kg/17L in 20 L container

     

    Part B

    2.3kg/2.5L in 6 L container

    Flash Point

    Part A

    Greater than 31?

     

    Part B

    Greater than 28?

     

    Mixed paint

    Greater than 31?

     

     

     

     

     

    Surface Preparation

    All surfaces to be coated should be clean, dry and free from contamination.

     

       Primed Surfaces

     

    The primer surface should be dry free from all contamination and 725-S52-60must be applied within the overcoating intervals specified (consult the relevantproduct data sheet).

     

    Areas of breakdown, damage etc., should be prepared to the specified standard (e.gSa2½(GB/T 8923.1-2011)or Abrasive Blasting, or Power Tool Cleaning) and patchprimed prior to the application of 725-S52-60.

     

    Repair

     

    725-S52-60 should be applied over a recommended primer coating scheme. The primer surface should be clean, dry and free from contamination. Areas of breakdown, damage etc. should be prepared to the specified standard (eg. Sa2.5) and primed prior to the application of 725-S52-60.

     

    725-S52-60may be applied directly over aged 725-S52-60 following thorough fresh water washing and degreasing provided the coating to be overcoated is in an intact and tightly adherent condition. Loose or flaking coatings should be removed back to a firm edge and an appropriate primer should be used to repair the area before application of the full coat.

     

     

     

     

    Limitations

     

    This product is not recommended for use in immersed conditions?

     

    When applying 725-S52-60 by brush or roller, for some colors, Two coats of 725-S52-60 may be required to give uniform coverage, especially when applying 725-S52-60 over dark undercoats.

     

    Apply in good weather. Temperature of the surface to be coated must be least 3? above the dew point when the humidity is lower than 85%.

     

    The dry time and overcoating interval may change according to the environment factors.

     

    Avoiding absorb the solvent steam and paint steam for long time. Skin and eyes must avoid contacting the paint. Pay attention to ventilate and fireproof when applying.

     

    Duty statement

    The data in the sheet base on the information from the laboratory and practice. The application may exceed the control, so we only ensure our product quality. We own the right of the data sheet modification without informing.

     

Send your message to this supplier
To:  

Huisins New Material Technology Co.,Limited

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  

  
Not exactly what you want? One request, multiple quotations Get Quotations Now >>